Report Section
Rail transportation
Table RA1: Railways in Canada, 2022
| 2022 Total Length of First | 2021 Total Length of First | Percent of | Percentage Change | |
|---|---|---|---|---|
| Main Track Operated | Main Track Operated | Total 2022 | Over Previous Year | |
| CN | 21,616 | 21,747 | 45.0 | (0.6) |
| CPR | 12,853 | 13,063 | 26.8 | (1.6) |
| VIA Rail | 285 | 285 | 0.6 | 0.1 |
| Regional and Shortline Railways | 13,256 | 8,321 | 27.6 | 59.3 |
| Total | 48,010 | 43,416 | 100.0 | 10.6 |
Notes and Sources
Notes: R = Revised data. CN = Canadian National. CPR = Canadian Pacific Railway.
Length of track does not include parallel trackage, spurs, sidings and yard trackage.
Source: Transport Canada, Statistics Canada
Report document
RA1-en.pdf28.39 KB
Notes: R = Revised data. CN = Canadian National. CPR = Canadian Pacific Railway.
Length of track does not include parallel trackage, spurs, sidings and yard trackage.
Source: Transport Canada, Statistics Canada
Length of track does not include parallel trackage, spurs, sidings and yard trackage.
Source: Transport Canada, Statistics Canada